Pagrindinis

Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm |

Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm |

629,70 €
Su PVM Pristatymas: 1 - 3 darbo dienos
Kodas: WP D9 WBS EE
Kiekis sandėlyje: 2 Prekės
Prekė parduotuvės sandėlyje
help_outlineKlausti apie prekę
Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm |

Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm |

Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm | White

 

Whirlpool Dryer Machine | WP D9 WBS EE | Energy efficiency class D | Front loading | 9 kg | Heat pump | Digital | Depth 61 cm | White
WP D9 WBS EE
2 Prekės

Prekės informacija

Ekranas
Yes
Gross depth (mm)
675.00 mm
Gross height (mm)
872.00 mm
Gross width (mm)
655.00 mm
Packing quantity
1.00 dalių
Tare weight (kg)
2.00 kg
Volume (m3)
0.39 m
Embeeded battery
No
WEEE tax
Yes
Paper/Pasteboard
1800.00 g
Plastic (No PET)
200.00 g
Gamintojo prekės modelio pavadinimas
WP D9 WBS EE
Gaminio spalva
White
Energijos suvartojimas per metus
128 kWh
Energijos efektyvumo klasė
D
Galingumas
900 W
Gamintojo prekės serija
Dryer Machine
Palette Qty
4 dalių
Įtaiso tipas
Front loading
Maksimalus triukšmo lygis
64 dB
Užraktas nuo vaikų
Yes
Garų funkcija
No
Aukštis
85 cm
Gylis
61 cm
Plotis
60 cm
Ekrano tipas
Digital
Savaime išsivalantis
No
Būgno vidinis apšvietimas
Yes
Džiovinimo pajėgumas
9 kg
Džiovinimo sistema
Heat pump
Būgno tūris
110 l
Apžvalgos langas
Yes
Atidėtos pradžios laikmatis
Yes
Atidėtas paleidimas (maks.)
24 h
Net weight
37.00 kg
Gross weight
39.00 kg
Warranty
24 mėn.
Producer
Whirlpool